Butlins Pool Area
Butlins Pool Area Wide
Butlins Shower Area
Butlins wall and floor tiled shower area
Butlins shop area showing floor

Butlins Splash Resort, Bognor Regis

Dyson-Briggs were appointed by main contractor Kier Construction to complete the floor and wall tiling work at this new pool facility for Butlins. The work consisted of tiling to various pool tanks including a Lido, Wave Pool, Seaside Playground and Tots pool. In addition there was all of the pool surrounds, stairs up to the various flumes & slides, changing facilities and reception / café areas. In total more than 2 million individual tiles were fixed in a 6 month period from October 2018 to April 2019.

Butlins rollarcoaster pool
Butlins outside entrance to pool